Extend the Service Life of Flue by Optimizing Its Process Structure

Wei Shen
2001-01-01
Abstract:There exist problems of short service life and high accident rate on cooling fule with vaporizing and motive smoke bell of No.2 converter in Laiwu iron and steel Co.,Ltd..The reasons include irrational design of furnace mouth,without releasing of the thermal expansion of the flue in radial direction,short stroke of water seal,much precipitation of residue in water seal and easy fatigue failure in flue baffle wall.The insufficiency of water power was improved and the service life of heat recovery boiler of converter was extended by taking measures of reconstructing the flue structure,changing the furnace and first sideways section as whole structure,enlarging oxygen nozzle and water seal stroke of smoke bell.
What problem does this paper attempt to address?