An Improved Spatial Scheduling Algorithm for Sub-Assembly in Shipbuilding

Teng Wang,Xuandong Mo,Mingzhi Chen,Xiaofeng Hu
DOI: https://doi.org/10.1109/case56687.2023.10260458
2023-01-01
Abstract:The sub-assembly is the smallest combined unit of shipbuilding and the foundation stage of hull construction. The delay of the sub-assembly would make it difficult to carry out the subsequent construction task and even affect the on-time delivery of the ship. Improving the efficiency of sub-assembly welding and shortening the assembly cycle has become the key problem that needs to be solved urgently in shipbuilding. Sub-assembly scheduling problem needs to consider both temporal and spatial constraints, which is an NP-hard problem. In this paper, a spatial scheduling method is proposed for sub-assembly scheduling. To minimize the makespan, multiple spatial scheduling rules are integrated for sub-assembly spatial scheduling to avoid missing the optimal solution. Besides, the genetic algorithm is used to optimize the scheduling sequence and select spatial scheduling rule because of the NP-hard property of the problem. Finally, numerical experiments are carried out on different scale cases. Experimental results prove the effectiveness of the proposed method.
What problem does this paper attempt to address?