Multi-Objective Spatial Scheduling At Block Assembly Shop In Shipbuilding

Junli Zheng,Zhibin Jiang,Feng Chen,Qiang Chen
2008-01-01
Abstract:A spatial scheduling pursues optimal sequencing and spatial layout that also satisfies traditional restrictions. In a shipyard, block spatial scheduling problems occur in various working areas and constrain the productivity of shipbuilding. To address the scheduling problems arising in block assembly shop, the critical path of shipbuilding process, this paper proposes a multi-objective spatial scheduling model. It is a NP-hard problem to obtain optimum scheduling due to its complexity. On the basis of the investigation on the characteristics of block shape and processing technique, a heuristic multi-objective spatial scheduling algorithm meeting block due dates, minimizing makespan and maximizing utilization ratio of work plates is developed using the strategies of shape similarity, technique similarity, clustering strategy and maximizing remnant place. Using the algorithm, visual scheduling results of block layouts and work orders can be obtained. The operation results based on real shipyard data show that satisfactory spatial scheduling performance and efficiency can be achieved in a short time.
What problem does this paper attempt to address?