Spatial Scheduling Problem with Time Window Constraint for Block Assembly in Shipbuilding

TAO Ning-rong,JIANG Zhu-hua,LIU Jian-feng
DOI: https://doi.org/10.13196/j.cims.2010.12.132.taonr.007
2010-01-01
Computer Integrated Manufacturing Systems
Abstract:Spatial scheduling problem as key resource scheduling problem was studied.Differences between spatial scheduling problem and three-Dimensional Bin Packing Problem(3D-BPP) were compared.Based on 3D spatial scheduling with time window as constraint,an improved heuristic positioning rules based on Extreme Points(EP) was proposed.Optimization algorithm based on tabu search and EP-based positioning rules was presented.Finally,a simulation experiment was provided to illustrate the effectiveness of the proposed approach.
What problem does this paper attempt to address?