Feasibility Study of an In-furnace Calcium Spraying Desulfurization Auxiliary System for a Large-capacity Boiler

Gang Chen
2012-01-01
Abstract:To solve such problems of a large-capacity boiler as a frequent change in coal quality,a small design allowance for the wet-method desulfurization system,a large work load and a high cost of an extension project etc.,an on-the-spot test was conducted of a 220 t/h boiler installed with an in-furnace calcium spraying system and the influence of the spraying location and Ca/S on the desulfurization efficiency was obtained.Furthermore,in combination with the numerical simulation results of the combustion of a 660 MW unit,the authors concluded that the optimum height for desulfurization by spraying calcium is around 40.51 m.By measuring and calculating the ash composition,ash melting point and particle diameter distribution etc.,the authors arrived at a conclusion that an additional installation of the in-furnace calcium spraying auxiliary desulfurization system to the 660 MW unit did not worsen the corrosion,ash deposition,slagging and wear of the heating surfaces of the boiler and the overall efficiency of the boiler decreased by 0.757% at the most outside,indicating that it has a relatively good safe and cost effectiveness.The research results are of realistic significance for power plants to widen the adaptability of their boilers for various coal ranks,enhance the reliability of their desulfurization systems and meet increasingly strict emissions standard etc.
What problem does this paper attempt to address?