SMW Piles for Fencing Deep Foundation Pit in the Covered Top-down Excavation

Yu Chen
2007-01-01
Abstract:From the top-down excavation in the work of deep foundation pit with SMW fencing adopted in construction of Zhujiang Rd.Underground Control Center of Nanjing Metro,introduction is made of the geological and hydrological conditions of the works,and the design and construction of the SMW fencing structure,specifically the design philosophy of the support system constructed through top-down excavation,the trestle system,and the vertical and horizontal support systems.Techniques like the back masonry work and water proof treatment of the lining can be of some reference for the design and construction of similar works.
What problem does this paper attempt to address?