Abstract:A two-stage supervisory control system is designed based on Siemens PLC(Programmable Logic Controller) according to the control requirement of ice-storage central air conditioning in this paper.The fieldwork station is composed of a PLC and a touching screen,which acts as a local platform of SCADA(Supervisory Control and Data Acquisition);the managing-work station is made up of an industry computer and a printer,serving as a main HMI(Human Machine Interface) which can print data and control the fieldwork station remotely in addition to all functions of the field work station.Results show that the designed supervisory control system can monitor and control the states of ice-storage central air conditioning timely and increase the cooling capacity and cooling efficiency effectively.