Probabilistic Production Simulation Method for Frequency Response Capacity Planning

Litao Guo,Zifeng Li,Weidong Li
DOI: https://doi.org/10.1109/ei252483.2021.9713541
2021-01-01
Abstract:In order to solve the problem of low frequency load shedding caused by the lack of high power of extra high voltage faults and the frequency stability of the grid due to the high penetration of renewable energy, it is an inevitable trend to develop standby capacity planning for power systems oriented towards frequency response. The traditional standby capacity planning method, which only considers the supply and demand power deviation index, can no longer meet the demand for fast frequency response. In response to the above problems, it is found that the dynamic change of system frequency needs to be considered when formulating capacity planning for fast frequency response. Considering the multi-resource structure of modern power systems, this paper simulates the output of wind power units, thermal power units, gas turbine power units, et al. Based on the idea of parameter aggregation, this paper establishes a frequency response model containing multiple resources and multiple units, and reduces the order of the model. A mathematical analysis method is used to solve directly for the frequency nadir to improve computational speed. The simulation examples and their results show that the probabilistic production simulation method proposed in this paper takes into account the dynamic frequency change process, and that its analytical method is faster compared to the simulation method and can meet the needs of standby capacity planning for fast frequency response.
What problem does this paper attempt to address?