Probabilistic power system production simulation based on chronological load curve

Qing Xia,Shaojun Wang,Nian de Xiang
1994-01-01
Abstract:A new method for probabilistic power system production simulation based on chronological load curve was proposed through the combination of the available capacity density function (ACPDF) and the chronological load curve. The chronological constraints can be easily taken into account and the calculation of hydro system optimization can be done more effectively. This method has been used to estimate the development of Northeast China power system in the coming decade and satisfactory result was achieved.
What problem does this paper attempt to address?