Research on Peak-cutting and Filling Technology Based on Flexible Interconnected Distribution Network

Zhen Shao,Xiao-Song Zou,Xu-Feng Yuan,Wei Xiong,Yong Yuan,Yu Miao,Zhukui Tan,Yutao Xu
DOI: https://doi.org/10.1049/cp.2019.0680
2019-01-01
Abstract:The imbalance of the load rate of each partition of the traditional distribution network and the large peak-to-valley difference of the load curve are the difficult problems to be solved in the optimization of the distribution network. The multi-terminal flexible interconnected distribution network can realize power interaction and power mutual support between the AC systems based on the DC power distribution center, which provides the possibility of multi-end load optimization. In order to fully consider the multi-objective optimization problem of economic benefits such as Peak Load Shifting optimization in flexible interconnected power distribution networks, this paper proposes a research on Peak Load Shifting optimization technology based on flexible interconnected power distribution network. Aiming at the effect of Peak Load Shifting, and the economics of time-sharing electricity price, a multi-objective optimization model of Peak Load Shifting based on flexible distribution network based on energy storage system was constructed. Considering the difference in the dimensions of the sub-objective functions, the multi-objective problem is optimized by adjusting the dimension function of the sub-objects to the dimensionless function through the normalization idea. Finally, the improved multi-objective particle swarm optimization algorithm is used to quickly find the Pareto optimal frontier surface, and the optimal scheme is selected in the Pareto frontier by fuzzy set theory.
What problem does this paper attempt to address?