Study On Peak Cutting And Valley Filling Based On Flexible Load

Yi Zheng,Chong Wang,Ping Ju
DOI: https://doi.org/10.1109/acpee48638.2020.9136463
2020-01-01
Abstract:Considering the increase in the proportion of flexible loads in the power grid, in order to provide a peak cutting and valley filling optimizing method of a load curve, this paper build an intraday optimal scheduling model for fixed frequency air conditioners and electric vehicles. In this model, the aggregation models of fixed frequency air conditioners and electric vehicles are established based on the Monte Carlo method, and the group control method is applied to respond to scheduling commands. To prevent voltage fluctuations caused by load change, the start-stop optimization strategy for transmission lines is added. Various constraints related are taken into consideration, such as the thermal comfort of human body, number of flexible loads, charging efficiency of charging post and the battery state of charge. As for the method, Cplex is used for its great performance in solving mathematical programming models, and an IEEE 33 bus system is tested through simulation studies. Then compare load curves before and after scheduling to verify the effectiveness of the proposed model.
What problem does this paper attempt to address?