Planning of Active Power Distribution Network Based on Source-Network-load Collaborative Optimization

Z. Jiang,Q. Yu,A. Li,Y. Xiong,G. Long,Y. Liu
DOI: https://doi.org/10.1049/icp.2020.0235
2021-01-01
Abstract:With the fast development of renewable energy generation, the randomness and volatility seriously threaten the stability of the power system. In order to improve the consumption rate of renewable energy and the economic benefit, the source-network-load collaborative optimization is put forward and widely used in the power system. And the active power distribution network which consists of the energy storage devices and flexible load is the best carrier to realize it. Based on the active power distribution network planning, this paper firstly designs an economic index covering construction cost and operation cost as the optimization objective. Then with the physical constraints consisting of the physical features of generation units, energy storage devices and flexible load, the source-network-load collaborative optimization model of active power distribution network is established. Finally, a case of city distribution network is presented to verify the effect of source-network-load collaborative optimization and the efficiency of the optimization model.
What problem does this paper attempt to address?