A Study Of Preventive Maintenance Scheduling Under Flexible Period

Jin Yulan,Jiang Zuhua,Hou Wenrui
2008-01-01
Abstract:The optimization of preventive maintenance (PM) under flexible period for multi-components with minimal repair at failures is studied. Mechanical service, repair and replacement are simultaneously considered to arrange the PM scheduling. This PM policy also makes the system at or above the minimal acceptable level of reliability. A genetic algorithm (GA) is used to be obtained the optimal preventive maintenance scheduling which minimize the expected cost over a finite time span. Example of the determination of optimal preventive maintenance scheduling for 5 components system is demonstrated.
What problem does this paper attempt to address?