The Optimization of Preventive Maintenance Scheduling for Production Machine of Production System in Finite Time Horizon

韩帮军,潘军,范秀敏,马登哲
DOI: https://doi.org/10.3969/j.issn.1672-5220.2004.01.022
2004-01-01
Abstract:The recursion relation of preventive maintenance (PM) cycle is built up concerning the concept of effective age and age setback factor proposed in this paper, which illustrates the dynamic relationship between failure rate and preventive maintenance activity. And the nonlinear optimal PM policy model satisfying the reliability constraints in finite time horizon following Weibull distribution is proposed. The model built in this paper avoids the shortcoming of steady analytical PM model in infinite time horizon and can be used to aid scheduling the maintenance plan and providing decision supporting for job shop scheduling.
What problem does this paper attempt to address?