Simulation‐based approach to joint production and preventive maintenance scheduling on a failure‐prone machine

Rachid Benmansour,Hamid Allaoui,Abdelhakim Artiba,Serguei Iassinovski,Robert Pellerin
DOI: https://doi.org/10.1108/13552511111157371
2011-08-16
Journal of Quality in Maintenance Engineering
Abstract:Purpose The purpose of this study is to propose and model an integrated production‐maintenance strategy for a failure‐prone machine in a just‐in‐time context. Design/methodology/approach The proposed integrated policy is defined and a simulation model is developed to investigate it. Findings The paper focuses on finding simultaneously two decision variables: the period ( T ) at which preventive maintenance actions have to be performed; and the sequence of jobs ( S ). These values minimize the maintenance costs (M C ) and the expected total earliness and tardiness costs (ET C ) away from a common due‐date D . Practical implications The paper attempts to integrate in a single model the two main aspects of any manufacturing and production systems: production and maintenance. It focuses on a stochastic scheduling problem in which n immediately available jobs are to be scheduled jointly with the preventive maintenance. The effect of the period ( T ) and the sequence of job ( S ) on the expected total cost are shown through a numerical example. Originality/value The paper proposes an integrated model that links production, preventive maintenance and corrective maintenance. It is simultaneously focusing on the period ( T ) at which preventive maintenance actions have to be performed and the sequence of jobs ( S ) to reduce production and maintenance‐related costs.
What problem does this paper attempt to address?