Preventive maintenance strategy and effect assessment of industrial equipments

Tong Sheng,Song Zhi-huan,Sun Chang-sheng
DOI: https://doi.org/10.3969/j.issn.1671-3133.2007.02.003
2007-01-01
Abstract:Random variable is introduced to assess the effect of Preventive Maintenance(PM)for industrial equipments.At the aim of the minimal average cost per unit time,and supposing that the parameter assessing the effect of PM has rectangular distribution,the optimal maintenance model is formulated and simulated.The simulation result shows that the PM model with random variable can reduce the growing tendency of the failure rate and the average cost per unit time effectively,and therefore the optimal model is better than ever.This approach can be used for scheduling the maintenance plan and providing the decision supporting for job shop scheduling.
What problem does this paper attempt to address?