A New Perspective For Construction Crashing Cost Analysis

Zhigang Shen,Ramin Shamsi,Ashkan Hassani
2012-01-01
Abstract:A construction project is a combination of many activities where the longest path determines the project duration. To shorten the project duration, activities on the longest path which is known as critical path should be shorten or crashing. Duration decrement of activity often causes the cost increase,which is considered as a Time Cost Tradeoff Problem. Nature of this tradeoff and its roots has been explore and presented utilizing Cobb-Douglas function in this article. We believe this perspective is new and may generate more interests in the future in construction management and scheduling. The objective is to analyze the nature of time cost tradeoff by taking the direct costs including labor and capital costs into account. All required production factors to carry out an activity are summarized into two main categories as "labor" and "capital" in which the capital contains all non-labor factors. Labor and capital costs compose the direct cost of activity while the duration is associated to the utilized amount of labor and capital. Time cost tradeoff is built on this fact, and appropriate mathematical model is proposed. The proposed concept paves the way for several researches in project scheduling and management such as capacity planning,pricing, and project financial estimation and management.
What problem does this paper attempt to address?