Activity-Based Costing And Construction Project Performance Improvement

Xq Liu,Sh Ma,W Li
2004-01-01
Abstract:Performance measurement is a hot issue and is important especially in the construction industry. To avoid some serious drawbacks, such as extensive material management, insufficient budget and low speed in the turnover of materials, which caused by current cost control method, activity-based costing is introduced for performance measurement and improvement in the construction project management. In this paper, activity-based costing provides a powerful method for quantifying the financial impact of construction project performance, enabling the construction project to more effectively target specific activities for improvement or elimination. In construction project performance analysis model based on activity-based costing, direct and indirect cost are attributed to various kinds of construction activities through cost drives and various kinds of construction activities belong to different construction products through resource drives. The three levels of activity analysis used by a construction project department are illustrated in this paper to identify and categorize performance-related expenditures. Although the analysis levels vary in terms of data and time requirements, a general five steps when using activity-based costing to improve the construction project performance can expound the concrete process.
What problem does this paper attempt to address?