Controlling Of Construction Parameters On Metro Shield Tunneling Traversing Adjacently Under The Existing Subway Tunnel

Chunhua Zou,Shunhua Zhou,Yuyong Sun,Renping Dai,Changdan Wang
2009-01-01
Abstract:Considering the characteristic of high risk about the construction of metro shield tunneling traversing adjacently under the existing subway tunnel and based upon the project of a new metro shield tunneling line A traverse adjacently under the existing subway tunnel line Bin a city of soft layer, an adjacent partition is given about the construction process, according to the unlikeness of the stress field of the soil under existing subway tunnel and soil surrounding the tunnel. This partition divides the construction process into three partitions that are shield close, traversing and far away. Due to the analysis of disturbance mechanism about shield construction which impacts on the surrounding soil and structure, how construction parameters (chamber pressure, grouting amount and advanced speed) influence on existing line's settlement at various stages is studied. On this basis, combined with conventional method of controlling shield construction parameters, the recommended value of construction parameters are given in this case. Finally, a comparative analysis has been done between the proposed shield construction parameters and the measured values. Results show that the size and variation of the proposed shield construction parameters and measured values are similar, while the maximum displacement of existing tunnel line B is controlled in 5mm successfully, which illustrates the new method of controlling shield construction parameters is accurate and reliable, so it can guide the construction of similar projects.
What problem does this paper attempt to address?