Optimization algorithm for solving multi-mode resourceconstrained project scheduling problem

刘士新,王梦光,聂义勇
DOI: https://doi.org/10.3969/j.issn.1000-5781.2001.01.011
2001-01-01
Abstract:In recent years, the intelligent optimization algorithms such assimul ated annealing (SA) and genetic algorithms (GA) have been showing powerful abili ties for solving combinatorial optimization problems, many papers reported their applications in such type problems, and some papers reported some hybrid algori thms. However, the effectiveness of the algorithm is very different between diff erent problem characteristics. Their successful design must combine with the pro blem characteristics. In this paper, we design a SA/GA hybrid algorithm for solv ing multi-mode resource-constrained project scheduling problem based on the pr ob lem characteristics. Thorough computational study for a standard set of project instances which has been widely used, we obtained some satisfactory results.
What problem does this paper attempt to address?