Study on the Erosion Law of Gas with Cuttings Against Tool Joint

Xin Ming,Zhanghua Lian,Tiejun Lin,Xinhai Chen,Jianxiang Zheng
DOI: https://doi.org/10.11885/j.issn.1674-5086.2013.11.04.02
2014-01-01
Abstract:Severe erosion against the tool joint always leads to rapid failure of the drill pipe in gas drilling. In order to understand the mechanism of this problem,we established the CFD model of the erosion of gas with cuttings against the drill pipe with 18° slope based on two phase fluid theory. According to this model,systematical studies have been made about the effects of different eccentricity,injection volume of gas,and drill rate on the erosion rate against the tool joint,and on the trajectory and distribution of cuttings and gas velocity. The results show that:at the first,when the drill pipe is in the cylindrical center of borehole,the distribution of erosion rate is symmetrical,the erosion against tool joint is more severe than against the drill pipes’ body and the maximum erosion rate is near the windward slope top. Meanwhile,the quantitative relationship between cuttings’ mass flow rate,gas velocity and the maximum erosion rate has been worked out. And then,the maximum erosion rate against the drill pipe and the erosion rate against the tool joint on one side of the wide flowpath are more severe when the drill pipe is eccentric. The maximum erosion is transferred from the joint to the drill pipes’ body when the drill pipe eccentricity from 30%to 70%. The maximum erosion rate against the tool joint increased with the increase of gas velocity when drill pipe eccentricity was at 0~30%,50%~70%and 80%~90%,respectively. But the maximum erosion rate against the tool joint decreased with the decrease of cutting concentration in wide flowpath when drill pipe eccentricity was at 30%~50%and 70%~80%,respectively. All the results from these studies provide the theoretical support for preventing failure of the tool joint and were applied in some oilfields.
What problem does this paper attempt to address?