Research and application of Micro-disturbed control system for shield driven tunnel construction process

Wenjun LIU,Guobao HU,Jiaping SUN,Helin FU,Hongxia GUO
DOI: https://doi.org/10.13265/j.cnki.jxlgdxxb.2017.05.006
2017-01-01
Abstract:In order to strictly control the disturbed effects on the adjacent buildings and structures of shield driven tunnel and to ensure the normal use of the existing buildings along the railway line and the smooth construction of the subway, a micro-disturbed control technology system for shield tunnel construction process is established. The system is formed by disturbance control of the before construction period and during construction period. According to the proposed construction schemes and support form, micro disturbance index and permissible value range are determined before construction, then the disturbance of subway construction to buildings can be predicted by FLAC3D to control micro perturbation parameter values in the range of permissible value. If the real-time monitoring value of micro-disturbed index goes beyond the permissible value range, the relevant construction parameters are adjusted to control the index value in the permissible value range, thus achieving micro disturbance in the construction. This system is successfully applied in the shield under the arcade project of No.2 and No.8 extension line of Guangzhou subway (the 14th section), which means the system is feasible and effective.
What problem does this paper attempt to address?