Preliminary estimation of transferable water from the upper reaches of the Yellow River

MA Rong,BAI Tao,WU Lianzhou,MA Chuanhui
DOI: https://doi.org/10.13207/j.cnki.jnwafu.2017.08.021
2017-01-01
Abstract:[Objective] Aiming in solving the water and sediment regulation problem in the upper reaches of the Yellow River,a multi-purpose model was established to determine the transferable water to provide guidance for the analysis of water transfer potential and effective water and sediment regulation.[Method] Considering ice flood control,water supply,power generation and sediment transport,a model for joint operation of Longyangxia and Liujiaxia cascade reservoirs in the upper reaches of the Yellow River was established based on 4 operation modes including ideal transferable water mode,measured transferable water mode,water to power mode,and the power generation combined mode.Then,the self-iteration simulation and optimization algorithm were used to solve the model.[Result] According to comparative analysis of the transferable water,power generation efficiency and adjustment objective in each operation mode,the transferable water of ideal mode met the supply requirement of Lanzhou section,but did not meet the power generation requirement of Longyangxia.The two designed values were not reached under the measured operation mode.In the water to power operation mode,the water supply rate of Lanzhou section reached the designed value,but the power output of Longyangxia did not reach the design value although it was improved.The goals of power generation and water supply were both achieved by the power generation combination mode.However,considering the shortage of water resources and the growing contradiction between supply and demand in the Yellow River basin,the practical operation mode of cascade hydropower has been changed from the initial design of "power to water" to "water to power",which gave priority to water supply over power generation.Therefore,the transferable water of "water to power" operation mode was recommended with the cumulative value for many years of 1.59 × 1010 m3.[Conclusion] The transferable water with the "water to power" operation mode is reasonable.The cascade reservoirs in the upper reaches of the Yellow River have strong potential for water and sediment regulation.When the supply water quantity is below 4× 109 m3,the regulation can be done once every three years,and in abundant years it can be done 1 or 2 times per year.
What problem does this paper attempt to address?