Analysis on Opportune Surplus Water Supply to Yellow River by South to North Water Transfer Middle Route Project

高季章,韩宇平,阮本清,王浩
DOI: https://doi.org/10.3321/j.issn:0559-9350.2005.01.004
IF: 2.4
2005-01-01
Journal of Hydraulic Engineering
Abstract:According to the principle of water balance the amount of opportune surplus water supply to the Yellow River by South to North Water Transfer Middle Route Project is calculated.The variations of hydrological condition both in water providing area and water receiving area due to difference in local weather are taken into account, and the surplus water must be the abandoned water of Danjiangkou Reservoir which can be transferred by the channel of Water Transfer Project not exceeding its transfer capacity. The analysis result shows that the annually averaged water amount to be transferred is 0.213×10~9m~3( for 2010 scenario) or 0.279×10~9m~3(for 2030 scenario), the maximum is 2.41×10~9m~3(for 2010 scenario) or 3.11×10~9m~3 (for 2030 scenario). The periods for water supply are in the flood season of the Yellow River.
What problem does this paper attempt to address?