Procedure Optimization for CFST Arch Bridge with Non-uniform Cross-section during Pouring Externally Wrapped Concrete

Haijun WU,Miaomin WANG,Ji QIAN
DOI: https://doi.org/10.3969/j.issn.1674-0696.2018.01.03
2018-01-01
Abstract:Taking Guansheng-Qujiang CFST Arch Bridge in construction in Guang'an as an example,to minimize the total vertical deformation of the vault in the process of pouring the second ring (variable cross-section) of the wrapped concrete,the pouring path of the second ring was optimized and the scheme of pouring path optimization was obtained by the influence factor of vault deflection and exhaustive method.The length of working face of the second ring (variable cross section) of the bridge was divided according to the principle that the length was equal and the weight of the wrapped concrete was equal.The scheme of equal length of working face and equal weight of working face were obtained respectively.Through comparing and analyzing the three schemes,it is found that the pouring path optimization scheme is better in the vault deflection,arch rib alignment,upper and lower chord stress as well as the stress of the wrapped concrete.
What problem does this paper attempt to address?