Erosion behavior of P110 tubing steel during fracturing operation

MA Wen-hai,DUAN Yong-gang,WANG Zhi-guo,LI Zhen,DOU Yi-hua
DOI: https://doi.org/10.13228/j.boyuan.issn1001-0963.20150052
2015-01-01
Abstract:Tubings used in fracturing operation were severely eroded by the fracturing fluid carrying sand at a high speed during large scale of fracturing in Xushen Gas-Field of Daqing Oilifeld, resulting in high risk of operation failure. Effects of lfow speed and incident angle of fracturing lfuid on erosion behavior of P110 tubing steel were studied by an independently developed jet erosion experimental equipment with a solid-liquid mixture of quartz sand and guanidine gum fracturing lfuid of 0.2%(mass fraction). The results show that the erosive rate does not linearly increase with the increase of lfow speed of fracturing lfuid. There is a critical lfow speed. Erosive rate of tubing grows in an exponential manner when the lfow speed of fracturing lfuid is larger than that critical lfow speed. There are two mechanisms of micro-shearing and impact for erosion of tubing in the fracturing lfuid. Erosive rate of P110 tubing steel is the highest when the incident angle of fracturing lfuid is 45°. Based on the erosion rate model obtained by the research, the relation between the decrease of thickness of P110 tubing steel and amount of fracturing lfuid can be calculated. The results of the simulation play an important role in reliability assessment for tubing used in large scale fracturing operation in Xushen Gas-Field.
What problem does this paper attempt to address?