A Closed Loop Dynamic Job Shop Planning

朱华锋,谭建荣,李涛,李伯鸣
DOI: https://doi.org/10.3321/j.issn:1004-132x.2002.16.009
2002-01-01
Abstract:It is the fact that the lead time and work time of routing adopted in MRPⅡ can not agree with the practice, because these values are certain ones.As contrasted to the existing shortcomings of MRPⅡ, a closed loop dynamic job shop planning is proposed.Three closed loops are generated based on the core of job shop planning, by means of the feedback of job shop production, the information of lead time, work center and routing is refreshed dynamically.