The Research of Short-term Optimal Operation Model for the Cascade Hydreelectric Stations on QingJiang River

赵振华,周建中,李承军
DOI: https://doi.org/10.3969/j.issn.1008-536x.2002.04.002
2003-01-01
Abstract:Three complex short-term optimal operation models for the cascade hydroelectric plants on QingJiang River are studied in this paper.The three Models include the constraints on storage level,on water use and valid power .A optimal solution to the three models was got by the method of POA,It was demonstrated that the optimal ways increase the effectiveness of the reservoir greatly and get the correct result.