Power system black-start strategy considering recovery time model

Yun ZHOU,Zheng YAN,Naihu LI,Shigang DAI,Lixia CHEN
DOI: https://doi.org/10.3969/j.issn.1003-3076.2015.02.003
2015-01-01
Abstract:The use of thermal power unit with fast cut back ( FCB) capacity as non?conventional black?start power is conducive to the restoration of power grid in short period and has tremendous social and economic benefits. The start of conventional thermal power unit is divided into cold, warm, hot, very hot and extreme hot five different starting modes. Unit start?up time model and restoration path time model constitute the system recovery time model. The consideration of technical check item in restoration path time model makes restoration paths that do not satisfy the technical conditions be excluded by calculation during the system recovery. A power system black?start strategy considering recovery time model is proposed with the target of maximizing the total output electric energy of units in given system recovery time. Numerical examples on the savnw 23?bus and IEEE 300?bus systems are used to dem?onstrate the accuracy of the strategy. Results of numerical example of large power system with multi?start powers further show that power unit with FCB capacity is conducive to speeding up the recovery of large power system.
What problem does this paper attempt to address?