Resilient Power System Black-start Restoration Model Considering Uncertain Renewable Energy

Yi Lin,Meng Li,Yuchen Tang,Wei Lin,Zhiming Chen,Zekai Wang,Tao Ding
DOI: https://doi.org/10.1109/icarcv57592.2022.10004336
2022-01-01
Abstract:This paper presents a novel multi-stage stochastic sequential black-start restoration model for the power transmission system with high penetration of renewable energy sources (RESs) after large-scale blackouts. Considering the uncertainties of RESs and the sequential restoration of the network, a two-stage generator model is designed to collaboratively dispatch the black-start units, RESs, and other thermal units during the restoration process. Finally, a modified New England 10-unit-39-bus test power system is employed to verify the effectiveness of the proposed model. Case studies indicate that the proposed model can coordinate the restoration of thermal units, RESs, and power loads. And RESs can effectively support the load restoration during the black-start process.
What problem does this paper attempt to address?