Optimization of Clearance Test Area for ± 1100 kV UHVDC Wall Bushing in AC and DC Partial Discharge Measurement

Hao TANG,Zejun SHEN,Shuqi ZHANG,Jinzhong LI,Chao WU,Guangning WU
DOI: https://doi.org/10.13336/j.1003-6520.hve.201709025005
2017-01-01
Abstract:In order to accurately measure partial discharge on ±1100 kV UHVDC wall bushing under AC and DC test voltage,and to verify the rationality of insulation design,material selection,and manufacturing process,we proposed an optimization method of clearance area with low background interference during partial discharge test.The electric field distribution of test area with wall bushing in the electromagnetic shielding hall was calculated using the finite element method under 1 273 kV AC and 1 683 kV DC voltage.On the basis of the AC partial discharge magnitude measurement results of a pointed grounding electrode in different locations,and using the DC partial discharge pulse measurement result of a high potential shielding ring in different areas,we obtained the reference electric fields for the optimization clearance area of ±1100 kV UHVDC wall bushing during the AC and DC partial discharge measurement test.The optimization method of AC and DC partial discharge clearance area is verified by using the comparative test of the background interference level.The optimization method of clearance area during partial discharge test proposed in this paper can be used to identify and suppress the partial discharge interference signal for other ±1100 kV UHVDC equipment.
What problem does this paper attempt to address?