Scheduling multiple orders per job with various constraints for hybrid flow shop

Bing-hai ZHOU,Teng WANG
DOI: https://doi.org/10.13195/j.kzyjc.2015.0399
2016-01-01
Abstract:With a comprehensive consideration of multiple product types and sequence-dependent setup times constraints in which processes of wafer fabrications, a scheduling model of multiple orders per job(MOJ) in a hybrid flow shop with an objective function of minimizing total completion time of the system is developed. On the basis of the descriptions, a column generation algorithm based on the job-product-machine three level disjunctive network flow is proposed. Furthermore, to improve the degradation effects of column generation algorithm, Lagrangian relaxation with sub-gradient optimization is combined into the frame of column generation algorithm, and then a modified column generation(MCG) algorithm adopting dual iteration is proposed. Finally, theory analysis and simulation experiments show that the developed MCG algorithm is valid and feasible.
What problem does this paper attempt to address?