The Optimization and Modification Technology of Shield Cutter Heads on Construction Site

Bin Zhang,Peng Hu,Faqing Wen,Huiyuan Yang,Qingbin Li
DOI: https://doi.org/10.7672/sgjs2017050113
2017-01-01
Abstract:The adaptability of the cutter head type to stratum characteristics is one of the most important factors in determining success for shield boring after determination the type of shield.Once parameters of cutter heads are made,it is not easy to change the cutter heads structure on construction site.According to the geological environments and construction condition,and to solve the problem of former cutter head type,the optimization and modification scheme is proposed after checking the structural strength and structural rigidity of cutter heads,and then the local cutter head is modified on construction site.The result shows that the optimization and modification project can increase the geological adaptability and improve the efficiency of shield construction.
What problem does this paper attempt to address?