LONG-TERM SURFACE SETTLEMENT OF SHIELD TUNNEL IN VISCO-ELASTIC SOFT SOIL

Cirong LU,Yi CAO,Jun JIANG,Kanghe XIE
DOI: https://doi.org/10.13905/j.cnki.dwjz.2017.05.019
2017-01-01
Abstract:Train loading was equivalent as rectangular cyclic load in the paper.Merchant model was adopted to simulate the viscoelasticity of soil,and corresponding viscoelastic constitutive model was obtained.The variety of the permeability of soil was considered by using the iterative recursive method.Analytical solution of the eess pore pressure of local leakage tunnel under train load was obtained,and the analytical solution of the long-term surface subsidence was further derived.The rationality of the above-mentioned analytical solution was verified,by comparing in the predicted settlement of viscoelastic analytical solution and the non-linear consolidation analytic solution with the field measured settlement of Shanghai Metro.The results show that the viscoelastic behavior of the soil is very significant during thelong-term deformation of soil,and the long-term surface subsidence of the tunnel is aggravated by the train load.The increase of the surface settlement is positively related to the seepage condition.
What problem does this paper attempt to address?