Study on dynamic response and long-term settlement of silty soil around Shanghai metro tunnel

Biaowei Sang,Chunling Yan,Cheng Wang,Xin Qu
DOI: https://doi.org/10.1038/s41598-024-59830-w
IF: 4.6
2024-04-23
Scientific Reports
Abstract:At present, the method for calculating long-term tunnel settlement predictions under metro loading considers only one working condition of passenger loading, which is inconsistent with actual working conditions. To establish a tunnel settlement model that accounts for variations in passenger flow, this study uses data mining methods to categorize metro operation into three working conditions: "peak period, secondary period, and low period." The impact of these passenger flow conditions on the dynamic response of the soil around the tunnel is analyzed. Then, based on the principles of calculus, a calculus-based prediction model is established to consider the changing patterns of metro passenger flow. The model is applied to analyze the long-term settlement characteristics of Shanghai Metro Line 10. The results indicate that, under identical conditions, soil displacement and dynamic deviatoric stress around the tunnel increase with passenger capacity. The calculus prediction model aligns more closely with actual working conditions than the conventional model. The predicted tunnel settlement of Shanghai Metro Line 10 after 20 years of operation is approximately 37.07 mm, with most settlement occurring in the early stages, primarily due to cumulative plastic deformation of the soil.
multidisciplinary sciences
What problem does this paper attempt to address?
The paper aims to address the issue of long-term tunnel settlement prediction caused by changes in passenger flow during subway operations. Specifically, current long-term tunnel settlement prediction methods only consider one passenger load condition, which does not align with actual conditions. To solve this problem, the study uses data mining methods to categorize subway operations into three conditions: "peak hours," "off-peak hours," and "low-peak hours," and analyzes the impact of these different passenger flow conditions on the dynamic response of the soil surrounding the tunnel. Based on the principles of calculus, the study establishes a calculus prediction model that takes into account changes in subway passenger flow. This model is applied to the long-term settlement characteristic analysis of Shanghai Metro Line 10. The results show that, under the same conditions, as passenger capacity increases, the displacement and dynamic deviatoric stress of the soil surrounding the tunnel also increase. Compared to traditional models, the improved calculus prediction model is more consistent with actual conditions and can more accurately predict the long-term settlement of subway tunnels. In summary, the main objective of this paper is to establish a prediction model that reflects the settlement characteristics of tunnels under different passenger flow conditions, in order to improve prediction accuracy and provide a basis for settlement control in related engineering projects.