Application of ASM No.2 to the Study of Upgrading WWTP for Biological Nitrogen and Phosphorus Removals

张代钧,卢培利,严晨敏,龙腾锐
DOI: https://doi.org/10.3321/j.issn:0253-2468.2003.03.009
2003-01-01
Abstract:The performance of three schemes(A/O,A 2/O,reverse A 2/O) of upgrading for biological nitrogen and phosphorus removal in some WWTP in Chongqing were predicted and the optimum operational parameters of each scheme were sought through the computer simulation program based on IWA ASM No.2. The results showed that : (1) The efficiency of TN removal could be increased from 34.2% to 58.6% by A/O process, if 1/4 of the existing aeration pond was converted to anoxic zone with dissolved oxygen concentration of 0.10 mg/L in the anoxic zone and the inner cycle mixed liquid ratio of 100%. Meanwhile, the TP was hardly influenced. (2) The efficiency of the TN removal could be increased from 34.2% to 62.3% and the TP from 41.7% to 78.3% in A 2/O process, if 12% of the existing aeration pond was converted of anaerobic zone and 24% to anoxic zone, with dissolved oxygen concentration of 0.10 mg/L in the anoxic zone and the inner cycle mixed liquid ratio of 100%. (3)The effect of the reverse A 2/O process was almost same to the A 2/O process, but the former was more feasible in practice. (4)The effluent COD and NH\++ 4-N concentrations could meet the standard.
What problem does this paper attempt to address?