A Case Study on Reconstruction Project of Pharmaceutical Intermediate Production Wastewater Treatment

Jian FAN,Ji-wei YAO,Yao YANG,Ming-fei LI
DOI: https://doi.org/10.3969/j.issn.1674-4829.2017.02.011
2017-01-01
Abstract:Aiming at solving the problem that the wastewater discharge treated by traditional UASB-SBR technology from the sewage treatment station of a biochemical corporation failed to meet the standard, this paper analyzes the defects of the original process and puts forward a new reconstruction process that physicochemical treatment of Electrolysis-Fenton oxidation-Coagulation and sedimentation combined with biochemical treatment of UASB-contact oxidation. The scale of the project treatment is 175 t/d, transformation costs about 800 thousand yuan, and running management also costs 11.5yuan per ton of wastewater. The engineering operation shows that the post-treatment system is effective, stable and reliable. What's more, COD as a key indicator of the effluent water reaches the third-class criteria of Integrated Wastewater Discharge Standard(GB8978—1996) and meets influent requirement of the chemical park where the project is located.
What problem does this paper attempt to address?