Research on Optimized Surveying of Horizontal Displacement in Subway Tunnel during Metro Operation Phase

Tian-yin CHEN,Ming KANG,Wu-sheng HU
DOI: https://doi.org/10.13238/j.issn.1004-2954.2017.11.017
2017-01-01
Abstract:The safety and comfort of the subway are closely related to the stability of tunnel structure,and the deformation monitoring during operation phase is crucial to the stability of the structure.To understand the relationship between the accuracy of the horizontal displacement and the change of the observation elements,the influence of the accuracy of the set point,the change of the number of the control point,the diversity of the observation elements of side-angle resection are analyzed based on the deformation monitoring data of the tunnel in the protected area of Nanjing Metro.The results of the quantitative analysis show that the number of the control point is an important factor to the accuracy of the set point,and the accuracy of the set point and the observation elements are correlated.Thus,the more optimized surveying is recommended under the condition that the accuracy of horizontal displacement monitoring meets the requirements.
What problem does this paper attempt to address?