Study on plan and workmanship of super bridge building equipment for aqueduct construction

强茂山,王兰涛
DOI: https://doi.org/10.3969/j.issn.1000-0860.2005.04.032
2005-01-01
Abstract:Based on the experience of the construction equipments for large-scale bridge, the construction technique of a super aqueduct which is designed across the Yellow River on the Mid-route of South-to-North Water Transfer Project, is studied herein. The bridge-building equipments both in home and abroad are firstly analyzed, and then the equipment with “centre-through-style” for the prefabricated construction scheme to the large tonnage U-aqueduct is proposed, furthermore, the general construction plan and the relative techniques for the construction with the equipments are studied as well. On the whole, the construction workmanship of the whole precast parts erection is demonstrated to be the developing tendency of the construction technology of the super aqueduct.
What problem does this paper attempt to address?