A method for flood forecasting based the operation chart of aggregated reservoir

张小丽,孙新国,周惠成,彭勇
DOI: https://doi.org/10.13243/j.cnki.slxb.20160329
2017-01-01
Abstract:Hydraulic constructions can dramatically alter the hydrological characteristics of the basin,especially the process and volume of the flood,which make it more difficult to accurately forecast flood.In the present study,we propose a new method for flood forecasting,which can effectively account for the hydraulic constructions.In this method,the hydraulic constructions is firstly aggregated as the equivalent reservoir,whose operation chart of holding and discharging is obtained according to the rule of the single hydraulic construction.Then,the new flood forecasting method is formed by combing the operation chart with the original TOPMODEL calibrated with the natural flood.The proposed method has been applied for forecasting flood in Subarea Ⅱ of the Fengman basin in Northeast China and results show that the precision is significantly improved with an advance of the qualified ratio of forecasting runoff yield.The situation that the value at beginning of flood season and after a long drought is usually underestimated has also been modified.Three types ot typical flood process simulated by the new method are more suitable to observed process.All the results indicate that the method developed can effectively account for the impacts of hydraulic constructions on flood process.
What problem does this paper attempt to address?