Risk Analysis on Downstream of a Reservoir when the Flood Control Method is Used: a Case of Shenwo Reservoir

Si-hui DONG,Rong ZHOU,Hui-cheng ZHOU
DOI: https://doi.org/10.3969/j.issn.1009-6094.2006.02.034
2006-01-01
Abstract:The present article aims to introduce the authors' research on the method of flood control forecast operation a reservoir can actualize in a flood season. Though it is an effectual measure to resolve the discrepancy between the flood control and the water resource utilization, the method for a reservoir to actualize the flood control forecast operation method decides whether it can be actualized as compared to the conventional operation method. So far, there does not exist effective quantitative methods to calculate the above risk. Having analyzed the risk factors of the flood control operation, a kind of numerical simulation has been put forward to calculate such risks based on the distribution of flood runoff of a reservoir and the forecast errors of the runoff. Thus, the risk to the downstream of a reservoir caused by the forecast errors can be calculated quantitatively and the present article has done such practical flood control forecasts. Taking Shenwo Reservoir for example, the authors have introduced the ideas and calculation methods in a detailed way. The calculation results of Shenwo Reservoir show that the risk is tolerable or acceptable with Shenwo Reservoir in contrast to the conventional operation forecast method.
What problem does this paper attempt to address?