A New Approximation Algorithm for Flow Shop with Transporter Coordinate.

Xin Han,Yinling Wang
DOI: https://doi.org/10.1007/978-981-13-2712-4_9
2018-01-01
Abstract:In this paper, we study a problem of the two-machine flow shop scheduling problem with intermediate transportation. This problem has been studied in [2, 4, 17]. The best approximation algorithm was presented in [17] with a two approximation ratio to our best knowledge. We propose a \((\frac{5}{3}+\varepsilon )\)-approximation algorithm for this problem, where \(\varepsilon >0\). Moreover, our algorithm can reach the lower bound \(\frac{5}{3}\) asymptotically given by [2] when \(\varepsilon \) is close to 0.
What problem does this paper attempt to address?