Study on pile underpinning of shield machine crossing through the pile foundation of Shajinggang Bridge and its 3D numerical analysis

Q. W. Xu,X. F. Ma,H. H. Zhu,X. R. Ge,Z. Z. Ma
2010-01-01
Abstract:In view of the interval tunnel of Shanghai Metro line 10, from Liyang Road Station to Quyang Road station, crossing through the pile foundation of Shajinggang Bridge on Siping Road, a scheme of foundation reinforcement and expanded raft underpinning is proposed for this project. In order to verify the rationality of this scheme, a series of three dimensional analyses on the entire construction processes were carried out, which includes foundation reinforcement, pit excavation, braces erection and pile underpinning, etc. Meanwhile, the analyses mainly focus on the deformation and stress behaviour of bridge structure as well as the change of pile bearing capacity. The findings indicate that foundation reinforcement and expanded raft underpinning can effectively reduce road surface settlement, improve stress behaviour of bridge structure and satisfy its controlling standard accordingly, while ensuring the bridge's normal traffic capacity. Such results may be useful in guiding this project and providing design and construction reference for future similar projects.
What problem does this paper attempt to address?