Analytical method for new tunnels crossing pile foundation of existing bridge: a case study

Kuan-Jun Wang,Guo-Yao Li,Pin-Qiang Mo,Zhongqi Shi,Fu-Bin Chen,Xin-Sheng Yin
DOI: https://doi.org/10.1680/jgeen.23.00060
2023-09-16
Geotechnical Engineering (Proceedings of the Institution of Civil Engineers)
Abstract:This paper describes an analytical method for investigating the tunnel-pile interaction for new tunnels crossing the pile foundation of the Shenzhen Bay Bridge, with a case study using a cavity expansion-based model. The three-dimensional analytical model developed in this study evaluates ground deformation and pile response induced by the construction of two Metro #13 lines and Wanghai Road Tunnel, and assesses the effectiveness of mitigation measures such as ground stabilization and isolation walls. The study reveals significant vertical displacement and surface settlement caused by the Wanghai Road Tunnel, and horizontal deformation and bending moments in specific pile foundations. The results show that reinforcement measures can effectively control formation deformation disturbance, and MJS isolation walls can limit horizontal and vertical displacements caused by excavation. To ensure the safe operation of the Shenzhen Bay Bridge, the study highlights the importance of comprehensively evaluating the safety of shield crossing schemes. The proposed analytical method could also serve as a pre-design tool and reference for optimizing tunnel construction, providing valuable guidance for future reinforcement schemes. In general, this study provides significant insights into the tunnel-pile interaction, which will be useful for bridge and tunnel engineering design and construction.
What problem does this paper attempt to address?