Current Status and Facility Operation for the 3 rd KSTAR Campaign

H. K. Na,K. R. Park,M. K. Park,K. W. Cho,C. S. Kim,Y. Chu,D. S. Park,K. P. Kim,O. Y.,Kim,S. H. Park,H. Yonekawa,I. S. Woo,W. S. Han,J. Hong,S. H. Baek,T. G. Lee,S. J.,Park,S. I. Lee,W. R. Lee,M. K. Kim,J. J. Joo,K. M. Moon,H. S. Kim,J. M. Park,H. S.,Shin,S. Sajjad,M. Kwon
2010-01-01
Abstract:KSTAR began high magnetic field (Toroidal Field: 3.5T) plasma operations with longer time and more reliable performance, which required implementation of a safe and stable KSTAR operation including superconducting magnets. Reliable tokamak operation was conducted to achieve the goal for the 2010 KSTAR campaign to produce a D-shaped plasma with the targeted current of 500 kA maintained for 5 seconds in duration. The cryoplant is one of the most important systems among KSTAR's utilities because it supplies liquid helium to the superconducting magnet, which requires continuous operational capabilities to maintain a cooldown of the system. The final goal of operating the KSTAR Integrated Control System (KICS) is to perform the roles of tokamak operation and plasma experiments with sustained stability, higher availability and security. Systematic and integrated KSTAR operational procedure is also required in order to unify various individual systems.
What problem does this paper attempt to address?