Front end designs for the advanced photon source multi-bend achromats upgrade

Y. Jaski,F. Westferro,S. Oprondek,S. Lee,B. Yang,M. Abliz,J. Downey,J. Mulvey,M. Ramanathan
2018-01-01
Abstract:The Advanced Photon Source (APS) upgrade from double-bend achromats (DBA) to multi-bend achromats (MBA) lattice is underway. This upgrade will change the storage ring energy from 7 GeV to 6 GeV and beam current from 100 mA to 200 mA. All front ends must be upgraded to fulfil the following requirements: 1) Include a clearing magnet in all front ends to deflect and dump any electrons in case the electrons escape from the storage ring during swap-out injection with the safety shutters open, 2) Incorporate the next generation x-ray beam position monitors (XBPMs) into the front ends to meet the new stringent beam stability requirements, 3) For insertion device (ID) front ends, handle the high heat load from two undulators in either inline or canted configuration. The upgraded APS ID front ends will only have two types: High Heat Load Front End (HHLFE) for single beam and Canted Undulator Front End (CUFE) for canted beams. This paper presents the final design of the HHLFE and preliminary design of the CUFE. OVERVIEW OF APS FRONT ENDS APS has a total of 35 sectors that can extract user beams. Currently there are 33 existing ID front ends (FE) and two vacant ID ports. The APS upgrade (APSU) will build out all 35 ID front ends with either a HHLFE for inline undulators or a CUFE for canted undulators. Out of the 33 existing ID front ends, 21 of them were built in the 1990s and are not capable of handling the heat load of the APSU ID sources and must be replaced with new FEs. The remaining 12 front ends that were built in the 2000s are capable to handle the heat load but must be retrofitted to have the next generation XBPMs and the clearing magnets. The APS existing ID front ends and their heat load limit is shown in Table 1. Table 1: APS Existing ID Front Ends Heat Load Limit Type of FEs FEv1.2 FEv1.5 CUFE HHLFE Ptotal (watts) 6.9 8.9 10×2 21 Ppeak (w/mrad2) 198 245 281 590 Existing Qty. 17 4 7 5 HIGH HEAT LOAD FRONT END The original HHLFE was designed in 2003 [1]. The original design was focused on the design of high heat load components. All photon masks and photon shutters were designed to handle the heat load limit of 21 kW total power and 590 kW/mrad2 peak power density, equivalent of two inline 3.3-cm-period undulators at 10.5 mm gap at 180 mA. This heat load limit was sufficient for the APSU and was adopted as the design requirement for the APSU front ends. The first major redesign of the HHLFE was in 2012 to incorporate the next generation XBPMs into the front end [2]. Since then many improvements have been made to the front end. This paper presents the new HHLFE for APSU MBA to include a clearing magnet in the front end and refine the design of the XBPMs to reduce cost and ease alignment, and introduce a new design of exit mask and XBPM2 combined unit. The layout of the new HHLFE is shown in Fig. 1. The aperture of key components are shown in Table 2. The design will be initially installed in the vacant port of 28-ID for the current storage ring to test out the new designs of the XBPM system. Table 2: HHLFE Aperture Table for APSU MBA Components Aperture H×V (mm) Pre-Mask 36×26 FM1 38×26 (inlet)/ 20×16 (outlet) FM2 24×20 (inlet)/ 9×12 (outlet) Clearing Magnet 13×20 (optical minimum) 18 (magnet gap)×65 (stay clear) Lead Collimator 19.5×19.5 (optical)
What problem does this paper attempt to address?