T2 Criteria for Evaluating Interchange Power Error on Tie Lines of an Interconnection

LIU Xianzhuang,YAN Faqi,XU Wei,HU Wei,ZHANG Yiwei,MIN Yong,YI Jun
DOI: https://doi.org/10.13335/j.1000-3673.pst.2016.2245
2017-01-01
Abstract:Tie-line power error is an important index for operation and control in an interconnection. T1 and T2 criteria are used for evaluation and responsibility-distribution of control performance of tie-line power error. Reasonability of the criteria exerts strong influence on effectiveness of tie-line power control. However, existing T2 criteria simply uses CPS2 criteria, possibly not suitable for tie line power error evaluation. According to control target of tie line power error, based on theoretical framework and several assumptions of control performance standard (CPS), this paper deduced a new T2 criteria. Essence of T2 criteria is a set of ACE (area control error) boundaries. Comparison between the proposed T2 criteria and CPS2 criteria was presented, showing difference between requests toward different control targets. Simulation results based on actual data showed that the proposed T2 criteria can bring a better evaluation effects than CPS2 as T2, thus verifying effectiveness of the proposed T2 criteria.
What problem does this paper attempt to address?