Simulation Study on Steel Plant Capacity and Equipment Efficiency Based on Plant Simulation

Shuai Deng,Anjun Xu,Hongbing Wang
DOI: https://doi.org/10.1002/srin.201800507
IF: 2.1258
2019-01-01
steel research international
Abstract:To improve production efficiency and reduce production costs, herein, we studied the steelmaking‐continuous casting section of a steel plant, established a dynamic logistics simulation model for the steelmaking‐continuous casting section and thereby realized model process control, parameter setting, and simulation data statistics using the Simtalk language and Method. This study validates model accuracy by comparing with the capacity and equipment efficiency available in field statistics. According to the results, after the converter duplex production proportion was increased from 33% to 100%, process continuity increased, the average conveying waiting time of the converters‐continuous casting machines was shortened by 5–14 min and thecorresponding tapping temperature dropped by 4.9 °C–13.7 °C under certain capacity. In addition, faster process production increased converter productivity from about 50% to 60%–70%, shortened the furnace idling time and lowered heat dissipation, thereby further reducing production costs.
What problem does this paper attempt to address?