Simulation of Dynamic Scheduling for Steelmaking and Continuous Casting Based on Witness

FENG Ting,ZHANG Wen-xin,TU Xue-ping,ZHANG Wen-xue
DOI: https://doi.org/10.3969/j.issn.1000-7024.2012.01.075
2012-01-01
Abstract:To simulate the dynamic scheduling of steelmaking and continuous casting,the characteristics of dynamic scheduling for steelmaking and continuous casting are analyzed.The key issues are discussed as follows: the setting of the routing,repairing technology,the setting of the disturbance factors and the visualization of the scheduling result.At last,the data from the iron and steel plants proves the effectiveness and feasibility of the simulation model.Through the comparison of different optimization algorithms,the quality and convergence efficiency of solution is different according to different algorithms.
What problem does this paper attempt to address?