Balance of the oxygen pipe network and scheduling in iron and steel enterprises

Chen Cong,Zhao Jun,Shao Zhijiang
DOI: https://doi.org/10.3969/j.issn.1001-4160.2012.09.013
2012-01-01
Abstract:The oxygen system is an integral part of the iron and steel production.Its working conditions will directly lead to a waste of energy or affect the user's normal production,thus affecting the economic efficiency of enterprises.The oxygen system of iron and steel enterprises is discussed in this paper.The characteristics of produce,storage and use of oxygen,also a mathematical model of the oxygen system are analyzed.Based on the mathematical model,a scheduling optimization is proposed considering the actual production process.Then modeling in the ILOG CPLEX and get an optimization solution,the result used as the scheduling optimization strategy for simulation.It shows the effectiveness of the model and the proposed scheduling optimization by comparing the actual command of factory scheduling with the scheduling optimization strategy.
What problem does this paper attempt to address?